Installing panels into the bus shelter


Before we could install the panels, we needed to clean the windows and scrape off old silicone from the previous project so it would not obstruct the panels. With the help of Jacoby Matott in the woodshop, we cut and ground down aluminum angles to fit into the window frames that would secure the panels. After we had all the tools and everything was prepped, we carefully brought down each panel to the bus stop after cleaning them one last time. We took a day to install one window and figure out the best methods of how to install and seal it, as well as figure out how long it would take overall. After that, we were able to get all the panels placed, sealed, and screwed in in one afternoon, thanks to the hard work of everyone.